Author Archives: timf

Layout Progress Update – Wiring and First Train Run!

Today I soldered all the feeder drops onto the rails and turnout frogs and then hooked them all up. I realized that since the layout was just on saw horses and there was no scenery yet, I could stand it … Continue reading

Posted in Track Work | Comments Off on Layout Progress Update – Wiring and First Train Run!

Layout Progress Update – Trackwork!

After doing some work on the house (and messing up my back, twice) I’m finally able to do some track laying! I soldered the joints and glued the track down with white glue in five sections.

Posted in Track Work | Comments Off on Layout Progress Update – Trackwork!

Layout Progress Update – Roadbed

This morning the postman dropped off the cork and rail I ordered. So that meant I could get to work! I laid down all the rest of the cork roadbed.

Posted in Construction, Track Work | Comments Off on Layout Progress Update – Roadbed

New Year, New Layout!

Since the basement is still full of boxes to sort out and find locations to put stuff (including model railroad stuff) I decided I’d build a switching layout on a shelf in my office for the time being. I should … Continue reading

Posted in Construction, Track Work | Comments Off on New Year, New Layout!

Moved, Again

The last update had us moving to a new house and building out a room for the layout. Unfortunately we decided that the house was not quite suitable for our needs and moved again about 11 months later. Our new … Continue reading

Posted in Misc | Comments Off on Moved, Again

New House, New Room for the Layout

As I mentioned in a previous post, we have moved. This means that I have torn down the old layout and will build a new one. This is actually good news because I learned a lot building the first layout … Continue reading

Posted in Construction | Tagged | Comments Off on New House, New Room for the Layout

Building the 120 Ton Wrecking Crane – Finished

I seem to have neglected to post the final steps and images from this build. Not too unusual for me. I also didn’t take a ton more photos during the final steps. But I have a few to share and … Continue reading

Posted in Rolling Stock | Tagged | Comments Off on Building the 120 Ton Wrecking Crane – Finished

New steam power for the Blackwing and Western

The Great Northern Historical Society had an auction recently and I put bids on two Sunset Models brass GN O-8 class locomotives. I won both of them for a very reasonable price!

Posted in Motive Power | Comments Off on New steam power for the Blackwing and Western

Moving!

We just had an offer accepted on a new house. The good news is that there is lots of basement for a much larger layout. The bad news is that we have to move. Which means tearing down the current … Continue reading

Posted in Construction | Comments Off on Moving!

Building the 120 Ton Wrecking Crane – Part 2

After the last blog post I spent some more time on this build. So I’ll make another progress post. Step five is to assemble the pulleys and boom forks. The pulleys are three pieces each and I had to sand … Continue reading

Posted in Rolling Stock | Tagged | Comments Off on Building the 120 Ton Wrecking Crane – Part 2